鋼筋網(wǎng)又稱熔接鋼筋網(wǎng)、鋼筋熔接網(wǎng)、鋼筋焊網(wǎng)、鋼筋熔接網(wǎng)片、鋼筋網(wǎng)片等,是縱向鋼筋和橫向鋼筋分別以一定的間距排列且互成直角、全部交叉點(diǎn)均熔接在一起的網(wǎng)片。
Steel mesh is also called welded steel mesh, welded steel mesh, welded steel mesh and reinforced mesh. It is a mesh with longitudinal steel bars and transverse steel bars arranged at a certain distance and at right angles to each other and all intersections welded together.
在日常生活中,對于一些日常生活的需要品,比如說家具、家電等產(chǎn)品。我們在挑選后購買,就可以馬上使用后體驗(yàn)出效果。但是對于鋼筋網(wǎng)片來說卻有所不同,采購鋼筋網(wǎng)片會有時(shí)間和產(chǎn)品質(zhì)量的制約。因此,我們在購買之前,一定要先摸好底,做到一些對產(chǎn)品和市場的了解。今天整理了以下幾點(diǎn),助您在選購鋼筋網(wǎng)片時(shí)能夠輕車熟路、萬無一失!
In daily life, for some daily needs, such as furniture, home appliances and other products. When we buy after selection, we can experience the effect immediately after use. But for the steel mesh, it is different. The purchase of steel mesh will have time and product quality constraints. Therefore, before we buy, we must have a good understanding of the product and market. Today, I have sorted out the following points to help you to be familiar with the road and safe when you purchase the steel mesh!
01注意網(wǎng)片的絲徑,絲徑是保證鋼筋網(wǎng)片質(zhì)量的重要部分,其誤差不得超過5mm,如果絲徑不能達(dá)標(biāo),那鋼筋網(wǎng)片質(zhì)量肯定達(dá)不到要求。另外要仔細(xì)觀察,千萬不能出現(xiàn)開焊、焊不牢等現(xiàn)象,那樣的都是劣質(zhì)產(chǎn)品。毫無支護(hù)效果,買了等于白買。
01 pay attention to the wire diameter of the mesh. The wire diameter is an important part to ensure the quality of the mesh. The error shall not exceed 5mm. If the wire diameter fails to meet the standard, the quality of the mesh must not meet the requirements. In addition, careful observation should be made to ensure that no open welding, unstable welding and other phenomena can occur. Such products are of poor quality. There is no support effect, buying is equal to buying for nothing.
02鋼筋網(wǎng)片是縱向鋼筋和橫向鋼筋分別以一定間距排列且成直角,全部交焊點(diǎn)均熔接在一起的,根據(jù)鋼梁的位置及溝寬的不同,鋼筋網(wǎng)片大多時(shí)候是需要定制加工的,在選購時(shí),一定要調(diào)研廠家的按需定做能力。
02 reinforcement mesh is arranged at a certain distance and at right angles to the longitudinal reinforcement and the transverse reinforcement, and all the cross welding points are welded together. According to the location of the steel beam and the width of the trench, most of the reinforcement mesh needs to be customized. When purchasing, it is necessary to investigate the manufacturer's customized ability.
03要選擇有經(jīng)驗(yàn)的鋼筋網(wǎng)片生產(chǎn)廠家。慢工出細(xì)活,有時(shí)候看似廠家的出活工期慢一點(diǎn),這是因?yàn)樵诩庸ぶ?,廠家技術(shù)人員需要對圖紙進(jìn)行仔細(xì)研究。對一些有管道通過的特殊地方需要提前處理,雖說工期慢一點(diǎn),但是這樣既能保證產(chǎn)品可以嚴(yán)絲合縫的安裝上去,也可以保證施工中的穩(wěn)定性,會大大節(jié)約了成本。
03 experienced manufacturers of steel mesh shall be selected. Slow work and meticulous work sometimes seem to slow down the work schedule of the manufacturer. This is because before processing, the technical personnel of the manufacturer need to study the drawings carefully. Some special places with pipeline passing through need to be handled in advance. Although the construction period is a little slower, it can not only ensure that the products can be installed in a tight fit, but also ensure the stability in the construction, which will greatly save the cost.
購買之后在使用時(shí)要確保施工人員沒有危險(xiǎn)
After purchase, ensure that there is no danger for construction personnel when using
時(shí)刻影響著鋼筋網(wǎng)片加工過程中的質(zhì)量問題。對提高鋼筋網(wǎng)片質(zhì)量及提升現(xiàn)場無危險(xiǎn)性有很大幫助。
The quality problem in the process of steel mesh processing is always affected. It is very helpful to improve the quality of steel mesh and improve the non danger of the site.
?。?)施工人員應(yīng)經(jīng)培訓(xùn)合格后上崗,焊工應(yīng)持有特殊工人作業(yè)證。
(1) The construction personnel shall be trained and qualified before going to work, and the welders shall hold the operation certificate of special workers.
?。?)焊工需要穿戴防護(hù)衣具,施工時(shí)焊工應(yīng)站在木墊或其他絕緣墊上。
(2) Welders need to wear protective clothing and stand on wooden pad or other insulating pad during construction.
?。?)焊機(jī)需要接地,以保證操作人員沒有危險(xiǎn),對于熔接導(dǎo)線及焊鉗接導(dǎo)線處,都應(yīng)有可靠的絕緣接地。
(3) The welding machine needs to be grounded to ensure that there is no danger for the operator. Reliable insulation grounding shall be provided for the welding wire and the wire connected by welding tongs.
?。?)大量熔接時(shí),熔接變壓器不得超負(fù)荷,變壓器升溫不得超過60℃。為此,要特別注意遵守焊機(jī)暫載率規(guī)定,以免過分發(fā)熱而損壞。
(4) When a large number of welding, the welding transformer shall not be overloaded, and the temperature rise of the transformer shall not exceed 60 ℃. For this reason, special attention should be paid to observe the provisions of the temporary load rate of the welding machine to avoid damage due to excessive heat.
(5)鋼筋的調(diào)直、切斷所使用的機(jī)械設(shè)備需要指定專人操作。
(5) The mechanical equipment used for steel bar straightening and cutting shall be operated by specially assigned person.
?。?)鋼筋網(wǎng)片的安裝,作業(yè)人員之間應(yīng)協(xié)調(diào)動作。
(6) For the installation of reinforcing mesh, the operators shall coordinate their actions.